Our Projects
- All
- Roads & Highways
- Irrigation & River Training
- Buildings & Facilities
- Electrical & Distribution Works

Construction of full distribution network including lines and substations in the Sankhamul distribution area to extend grid access.

Second contract package for medium‑ and low‑voltage distribution lines and associated infrastructure under the Sankhamul rural electrification scheme.

Supply, delivery, installation, testing, and commissioning of 11/0.4–0.23 kV electrical distribution network for Sankhamul Gramin Bidhutikaran Ewam Bitran Samudayik Sanstha.

Major repair and maintenance of access road to Upper Trishuli‑1 Hydroelectric Project to ensure all‑weather access for construction traffic.

Design and construction of an industrial access road linking limestone mine in Palpa to cement factory in Nawalparasi for Hongshi...

Construction of the Bulbule–Merauli–Chakhaura road section to enhance local transport and market access.

Construction and upgrading of the Ek Dumja–Marin Khola–Kapilkot–Lalbandi road link to strengthen access between hill and Terai sections.

Double Bituminous Surface Treatment (DBST) and associated road improvements on Liwang–Darbot Road.

Road construction and upgrading works along the Ghorahi–Harnak–Kamire–Murkuti–Pyuthan corridor to improve regional connectivity.

Construction of a new fuel station facility in Butwal to support Nepal Army logistics and operations.

Construction of district administration office and police residential quarters to modernize public service facilities in Bhojpur.

Development of police office, barrack and kitchen facilities to enhance law‑enforcement infrastructure in Khotang.

Construction of a District Health Office complex at Salle to centralize health administration and services.

New rural health post building at Korchabang to improve primary healthcare access in the area.

Construction of a new RCC seismic‑resistant school building for Nauligeshwori School to ensure safe education infrastructure.

Rebuilding Golmeshwori Basic School as an RCC earthquake‑resistant facility following the 2015 earthquake.

Construction of two earthquake‑resistant school buildings under the Education Cluster program to restore safe learning environments.

Development of a new hospital building complex at Reugha, Libang to strengthen district‑level healthcare services.

Construction of a scenic view tower at Ramche to promote tourism and provide panoramic public viewing facilities.

Upstream intake protection on Rapti River left bank for Praganna & Badkapath Irrigation Projects, executed as part of a joint...

Construction of V‑type revetment and launching apron along Bauraha Khola to protect embankments and adjacent land.

Second package of Bauraha Khola revetment and apron works enhancing overall river training system.

Targeted protection works around key spur and embankment sections of Western Koshi Embankment to prevent river attack.

Long stretch of anti‑erosion protection along Eastern Afflux Bund to reinforce the Koshi River flood defense system.

Emergency anti‑erosion measures downstream of Koshi Barrage to stabilize embankments prior to monsoon floods.

Construction of dyke along Rapti River near Malmala to protect Badkapath Irrigation Project infrastructure and nearby communities.

Critical anti‑erosion works around existing spurs along Eastern Afflux Bund to protect Koshi River embankments.

River training works on Gachhiya area under package PC17 for flood protection and erosion control.

River training and embankment construction along Budhi Kesliya River to safeguard irrigation command areas.

Additional Lohandra River training works (PC10), improving flood safety and channel stability.

Major river training and embankment package on Lohandra River (PC8) to protect settlements and agricultural land.

Further reach of Chisang Khola training (PC5), strengthening flood protection for the project area.

Continuation of Chisang Khola river training works under package PC4, including embankment and protection structures.

River training and embankment works on Chisang Khola under package PC3 to protect adjacent land and infrastructure.

Settling basin and associated river protection structures to reduce sediment load and protect irrigation infrastructure.

River training and protection works along Pathariya River to secure the Rani Jamara Kulariya irrigation command area.

Additional reach of Rapti River right‑bank embankment and revetment to safeguard irrigated command area and nearby settlements.

Flood protection embankment with launching apron and slope revetment along the right bank of the Rapti River under Bagrapur Praganna...