Construction of V‑Revetment with Launching Apron, Bauraha Khola (Contract 03/073‑74)
Construction of V‑type revetment and launching apron along Bauraha Khola to protect embankments and adjacent land.
Construction of V‑type revetment and launching apron along Bauraha Khola to protect embankments and adjacent land.
Second package of Bauraha Khola revetment and apron works enhancing overall river training system.
Targeted protection works around key spur and embankment sections of Western Koshi Embankment to prevent river attack.
Long stretch of anti‑erosion protection along Eastern Afflux Bund to reinforce the Koshi River flood defense system.
Emergency anti‑erosion measures downstream of Koshi Barrage to stabilize embankments prior to monsoon floods.
Construction of dyke along Rapti River near Malmala to protect Badkapath Irrigation Project infrastructure and nearby communities.
Critical anti‑erosion works around existing spurs along Eastern Afflux Bund to protect Koshi River embankments.
River training works on Gachhiya area under package PC17 for flood protection and erosion control.
River training and embankment construction along Budhi Kesliya River to safeguard irrigation command areas.
Additional Lohandra River training works (PC10), improving flood safety and channel stability.